WesTech Engineering provides largest clarifiers in Florida.
• Ten 195 foot diameter COP™ clarifiers will be installed as part of the HLD upgrade at Miami Dade’s South District WWTP.
WesTech Engineering, Inc. of Salt Lake City, Utah will supply four new 195 ft. diameter COP™ clarifiers and replace the six existing 195 ft. diameter clarifiers with their proprietary COP™ Clarifier design for the Miami Dade South District WWTP. Located in Miami Florida, the South District Wastewater Treatment Plant has a current capacity of 112 million gallons per day (MGD) of treated water. The new clarifiers will be a key part of an expansion that will increase the plant capacity to a peak flow of 285 MGD to meet increased demand caused by population growth and regulatory requirements.
Read the full story.